Halifax (metro) Transit.
#221
Posted 26 February 2012 - 05:31 PM
1. As far as I know, yes, the CNIB cards are now accepted, but it's a little murky. Until recently, they were not accepted, and you had to get a special pass directly from Metro Transit. A few years ago, MT tried to stop the program and make visually impaired people pay the regular fare, so as not to supposedly "discriminate" against other disabled transit users. There were protests, and this never came to pass. Then, a human rights complaint was filed, the result being that MT had to start accepting regular CNIB passes by November 2011. Just to be safe, though, your best bet would be to confirm this by calling the HRM Call Centre at 902-490-4000, or emailing them. They're very quick at responding, in my experience.
2. If you're on the Halifax Peninsula, Route 1 is the main "artery" route, with consistent service every 10 minutes during weekdays, every 15 minutes on weekends. Other routes generally run every 15 minutes during rush hour, every 30 minutes during non rush-hour and Saturdays, and every 30-60 minutes on Sundays.
3. I don't really know the answer to this question, sorry. However, I do believe that Hope Cottage is the most well-known soup kitchen, and it's located just outside of downtown.
4. I think it's probably the same as other places: there are really nice drivers, and really nasty ones. However, the majority I've encountered have been friendly and professional.
5. The majority of our fleet is now low floor: out of 300 buses, 56 are high floor. Over half of the routes are dedicated low-floor routes as well.
6. Halifax does not have stop announcements. They're supposed to be coming in the next 5 (?) years or so, but there's been no human rights mandate to provide them, unlike Ontario. However, I have seen visually impaired riders ask the driver to tell them when their stop is coming up, and the driver (or other riders) have done so without fail.
I hope you enjoy Halifax!
#222
Posted 01 March 2012 - 03:45 AM
Halifax_Route10, on 26 February 2012 - 05:31 PM, said:
1. As far as I know, yes, the CNIB cards are now accepted, but it's a little murky. Until recently, they were not accepted, and you had to get a special pass directly from Metro Transit. A few years ago, MT tried to stop the program and make visually impaired people pay the regular fare, so as not to supposedly "discriminate" against other disabled transit users. There were protests, and this never came to pass. Then, a human rights complaint was filed, the result being that MT had to start accepting regular CNIB passes by November 2011. Just to be safe, though, your best bet would be to confirm this by calling the HRM Call Centre at 902-490-4000, or emailing them. They're very quick at responding, in my experience.
2. If you're on the Halifax Peninsula, Route 1 is the main "artery" route, with consistent service every 10 minutes during weekdays, every 15 minutes on weekends. Other routes generally run every 15 minutes during rush hour, every 30 minutes during non rush-hour and Saturdays, and every 30-60 minutes on Sundays.
3. I don't really know the answer to this question, sorry. However, I do believe that Hope Cottage is the most well-known soup kitchen, and it's located just outside of downtown.
4. I think it's probably the same as other places: there are really nice drivers, and really nasty ones. However, the majority I've encountered have been friendly and professional.
5. The majority of our fleet is now low floor: out of 300 buses, 56 are high floor. Over half of the routes are dedicated low-floor routes as well.
6. Halifax does not have stop announcements. They're supposed to be coming in the next 5 (?) years or so, but there's been no human rights mandate to provide them, unlike Ontario. However, I have seen visually impaired riders ask the driver to tell them when their stop is coming up, and the driver (or other riders) have done so without fail.
I hope you enjoy Halifax!
WOW, THANK YOU!!
ok, everyone, you guys rock!
I knew about the OLD cnib system as my BF used to live in halifax about 10 years ago, he's moving back next year.. currently in St, Stephen NB, unable to get anywhere due to Acadian being on strike,, so he's really wanting to move back soon after I move to Halifax..
I'm also trying to get into a program run by the YWCA, so likely going to be in the central Halifax area..
so excited to get to Hali!
Accessibility Advocate since 1994
PROUD ATU supporter since 1996..
~ UNITED WE STAND, DIVIDED WE FALL ~
If You don't like my reality, as I live it & write it, DONT READ IT!
John 3:16-17
GOD is the Potter, I Am his Clay.
~ "We all have ability. The difference is how we use it."
~ "I am glad I am blind. I can see more of life this way."
~ “Handicaps are really to be used another way to benefit yourself and others.”
Quotes by> Stevie Wonder
Married to an amazing man, 10/12/12
#223
Posted 16 March 2012 - 10:22 AM
#224
Posted 28 March 2012 - 11:13 PM
#225
Posted 30 March 2012 - 04:58 PM
In other news, Metro Transit's put out their 2012-13 Annual Service Plan. It's a veritible goldmine of statistics, charts, and service expansions and cuts (or "efficiencies" as they're called here). There's also more information on routing changes as a result of the new Bridge Terminal, and the Ragged Lake TC Expansion.
http://www.halifax.c...finaldraft2.pdf (Large file!)
#226
Posted 04 April 2012 - 05:38 AM
This is going to be a big learning curve to not have BLUENIGHT bus service as we have in toronto! lol, no worries, I rarely use it!
Accessibility Advocate since 1994
PROUD ATU supporter since 1996..
~ UNITED WE STAND, DIVIDED WE FALL ~
If You don't like my reality, as I live it & write it, DONT READ IT!
John 3:16-17
GOD is the Potter, I Am his Clay.
~ "We all have ability. The difference is how we use it."
~ "I am glad I am blind. I can see more of life this way."
~ “Handicaps are really to be used another way to benefit yourself and others.”
Quotes by> Stevie Wonder
Married to an amazing man, 10/12/12
#227
Posted 06 April 2012 - 02:07 PM
Now to figure out where to find a place to live! lol!
See you all in Halifax!
Halifax_Route10, on 30 March 2012 - 04:58 PM, said:
In other news, Metro Transit's put out their 2012-13 Annual Service Plan. It's a veritible goldmine of statistics, charts, and service expansions and cuts (or "efficiencies" as they're called here). There's also more information on routing changes as a result of the new Bridge Terminal, and the Ragged Lake TC Expansion.
http://www.halifax.c...finaldraft2.pdf (Large file!)
I found this report very interesting,
one issues I have is the lack of becoming accessible to the blind community, hmmm, going to have to work on that when I get moved into Halifax..
hmmm, back to my old life as an accessibility advocate eh? should be fun1
Accessibility Advocate since 1994
PROUD ATU supporter since 1996..
~ UNITED WE STAND, DIVIDED WE FALL ~
If You don't like my reality, as I live it & write it, DONT READ IT!
John 3:16-17
GOD is the Potter, I Am his Clay.
~ "We all have ability. The difference is how we use it."
~ "I am glad I am blind. I can see more of life this way."
~ “Handicaps are really to be used another way to benefit yourself and others.”
Quotes by> Stevie Wonder
Married to an amazing man, 10/12/12
#228
Posted 21 April 2012 - 02:00 AM


These pictures were taken about two weeks ago, and construction has progressed quite a bit since then. Sorry about the quality: my iPod was the only camera I had with me at the time.
Two things of interest: the central "tower" of the terminal building will have an elevator, and the trench you see in the second photo, which will be some of the boarding platforms and roadway, will essentially be underground - there's going to be a 200-foot-wide (or so) pedestrian overpass above it leading to the aforementioned elevator.
There will be 16 platforms, 8 of which will be suitable for artics.
20,000 people a day use the old terminal, and this replacement can't come soon enough!
#229
Posted 30 April 2012 - 04:26 AM
Halifax_Route10, on 21 April 2012 - 02:00 AM, said:


These pictures were taken about two weeks ago, and construction has progressed quite a bit since then. Sorry about the quality: my iPod was the only camera I had with me at the time.
Two things of interest: the central "tower" of the terminal building will have an elevator, and the trench you see in the second photo, which will be some of the boarding platforms and roadway, will essentially be underground - there's going to be a 200-foot-wide (or so) pedestrian overpass above it leading to the aforementioned elevator.
There will be 16 platforms, 8 of which will be suitable for artics.
20,000 people a day use the old terminal, and this replacement can't come soon enough!
I've heard from friends that the old terminal is really NASTY!
I'm going to be probably doing a lot of geeking off when I get into Halifax..
I'm super excited about the new Terminal.
Accessibility Advocate since 1994
PROUD ATU supporter since 1996..
~ UNITED WE STAND, DIVIDED WE FALL ~
If You don't like my reality, as I live it & write it, DONT READ IT!
John 3:16-17
GOD is the Potter, I Am his Clay.
~ "We all have ability. The difference is how we use it."
~ "I am glad I am blind. I can see more of life this way."
~ “Handicaps are really to be used another way to benefit yourself and others.”
Quotes by> Stevie Wonder
Married to an amazing man, 10/12/12
#230
Posted 03 May 2012 - 06:10 PM
TransitQuebec.com Network | Youtube | Gallery | Twitter (NOT often updated !)
#231
Posted 04 May 2012 - 05:52 PM
eclair14, on 03 May 2012 - 06:10 PM, said:
I was on my way to the airport today to see what the route was in case I had to drive it at any point. On my way out much to my surprise 526 passed me on the opposite side of the highway heading to Ragged Lake garage.
#232
Posted 07 May 2012 - 12:10 AM
buschic, on 30 April 2012 - 04:26 AM, said:
I'm going to be probably doing a lot of geeking off when I get into Halifax..
I'm super excited about the new Terminal.
Underground transit terminal? Where could I find information on this? Looking it up in Halifax SSP as I speak...
edit: found this on Halifax SSP http://halifax.ca/me...ts/terminal.PDF (PDF document of supposed development)
#233
Posted 07 May 2012 - 12:50 AM
armorand, on 07 May 2012 - 12:10 AM, said:
edit: found this on Halifax SSP http://halifax.ca/me...ts/terminal.PDF (PDF document of supposed development)
That PDF is actually of an old design that went up the hill, rather than across it. To make a long story short, there were NIMBY issues, so they had to rotate the layout 90 degrees and change it significantly.
Page 9 of this PDF document has the current plan for the new terminal:
http://www.halifax.c...00126ca1014.pdf
From the bottom to the top of the plan, there is a pretty significant incline that the terminal is being built on, so the upper platforms on that plan will be bounded by a sheer 12ft (+/-) concrete wall.
Here's a rendering of what the terminal will look like, looking up the hill:
http://www.halifax.c...ing-Overall.pdf
It's not truely "underground", as nice as that would be. However, several of the platforms on one side will essentially be covered up by a very wide pedestrian bridge, which will go from the top of the concrete wall to an elevator in the central "tower". The bridge can be glimpsed on the left side of this rendering:
http://www.halifax.c...rmFromUpper.pdf
I imagine it will hide the sunlight on that side at least a bit!
For your reading enjoyment, this page has several documents relating to the new terminal:
http://www.halifax.c...lExpansion.html
#234
Posted 07 May 2012 - 11:28 AM
Looks good, especially with the skyline view of Halifax across the bay in the rendering! With the possible Skye towers going up, Halifax is going to look pretty good!
Kinda makes me want to visit Halifax actually. And I wonder what the floor plans are for this! The inside of the building particularly
#235
Posted 11 May 2012 - 11:59 AM
#236
Posted 11 May 2012 - 05:47 PM
TheAverageJoe, on 11 May 2012 - 11:59 AM, said:
At the Ferry Terminals, definitely. At Mumford, Portland Hills, and Sackville, and the new Bridge terminal (when it opens), it's probable. All of the other terminals don't have an indoor waiting area, so it's impossible to get maps there. However, quite a few lotto booth-type places have maps, as well as the visitor info centres.
#237
Posted 11 May 2012 - 10:28 PM
Halifax_Route10, on 11 May 2012 - 05:47 PM, said:
Thanks alot, worse case for me is I will use my Playbook.
#238
Posted 16 May 2012 - 05:35 PM
The pedestrian overpass is being installed:
A closer view:
What it looks like from below:
View from the side:
Another one. I wonder what those doorways in the concrete wall are for?
Sorry for the quality, I am without a "proper" camera at the moment.
The terminal should be completed ahead of schedule and will be opening in mid-July.
#239
Posted 17 May 2012 - 04:03 PM
Halifax_Route10, on 16 May 2012 - 05:35 PM, said:
The terminal should be completed ahead of schedule and will be opening in mid-July.
It isn't that bad! I use my iPhone camera all the time for CPTDB/SSP
#240
Posted 17 May 2012 - 10:53 PM
1 user(s) are reading this topic
0 members, 1 guests, 0 anonymous users