Proterra ZX5: Difference between revisions
Mattb816789 (talk | contribs) |
Mattb816789 (talk | contribs) |
||
Line 87: | Line 87: | ||
===United States [[Image:Flag of the United States.png|28px]]=== | ===United States [[Image:Flag of the United States.png|28px]]=== | ||
* [[DASH (Alexandria Transit Company)|Alexandria Transit Company]] (DASH) - Alexandria, VA | * [[DASH (Alexandria Transit Company)|Alexandria Transit Company]] (DASH) - Alexandria, VA | ||
* [[Broward County Transit]] (BCT) - Broward County, FL | * [[Broward County Transit]] (BCT) - Broward County, FL | ||
* [[Capital Transit System]] - Juneau, AK | * [[Capital Transit System]] - Juneau, AK | ||
* [[Charleston Area Regional Transit Authority]] - Charleston, SC | * [[Charleston Area Regional Transit Authority]] - Charleston, SC | ||
* [[Chicago Transit Authority]] - Chicago, IL | * [[Chicago Transit Authority]] - Chicago, IL | ||
* [[Detroit Department of Transportation]] (DDOT) - Detroit, MI | |||
* [[Eagle County Regional Transportation Authority]] - Eagle County, CO | * [[Eagle County Regional Transportation Authority]] - Eagle County, CO | ||
* [[Everett Transit]] - Everett, WA | * [[Everett Transit]] - Everett, WA |
Revision as of 10:23, 24 May 2022
Proterra ZX5 | |
---|---|
![]() | |
Years of manufacture | 2020 to present |
Length | 36 or 42 feet |
Width | 102 inches |
Power/Fuel | Electricity |
The Proterra ZX5 is a battery-electric transit bus available for sale in the United States and Canada. Available in 35ft and 40ft lengths, it is the company's fifth generation of battery electric bus. The ZX5 was formally launched on September 15, 2020,[1] replacing the Catalyst line of buses. Edmonton Transit System was the launch customer for the 40-foot ZX5. The Southern Teton Area Rapid Transit was the launch customer for the 40-foot ZX5 in the United States.[2]
The ZX5 features the same fibreglass and balsa wood body structure as the Catalyst, but incorporate design changes to both increase battery capacity and standardization with electric vehicle charging protocols. The overall appearance of the vehicle has been made more angular, while the roof fairing has been made more streamlined with provisions for roof-mounted battery packs, as well as integrated SAE J3105 (OppCharge) roof charger rails. The redesigned roof fairing has also resulted in an overall decrease of the vehicle's height by 6 inches.[3] An additional plug-in charge port has also been added ahead of the front doors. The suspension system of the vehicle has also seen improvements. The drivetrain options have been updated with slightly more powerful motor offerings.
The standard ZX5 model, with a 220 kWh energy storage system (corresponding to the previous Catalyst XR model), can travel up to 201 km (35ft) or 193 km (40ft) on a single charge, depending on the configuration of the vehicle. The ZX5+ model with a 440 kWh ESS (corresponding to the Catalyst E2 model) can travel up to 386 km (35ft) or 373 km (40ft) on a single charge. The ZX5MAX is the longest-range option available. With a 660 kWh energy storage system, the ZX5MAX can travel up to 529 km on a single charge. The ZX5MAX battery option is only available for the 40-foot length ZX5.
The ZX5 can be charged using the SAE J3105 (OppCharge) overhead pantograph charging protocol, or with a J1772 CCS charger in the depot. The ZX5 with any battery option can be fully charged in around 2.9 hours using the OppCharge overhead charging system.[4] Utilizing plug-in charging, the standard ZX5 takes around 2.9 hours to be fully charged, while the ZX5MAX takes around 4.7 hours to be fully charged.
Specifications
Dimensions | |||
---|---|---|---|
Length: 11.25m (36.9') or 12.95m (42.5') | |||
Width: 2.59m (102") | |||
Height: 3.25m (128") | |||
Wheelbase: 35ft: 6.17m (20.2'); 40ft: 7.52m (24.7') | |||
Turning Radius: 35ft: 10.97m (36'); 40ft: 12.78m (41.9') | |||
GVWR: 35ft: 19,051 kg; 40ft: 19,799 kg | |||
Traction motor | Availability | ||
ProDrive drivetrain | UQM HD250 250 kW peak permanent magnet motor | 2020 to present | |
DuoPower drivetrain | Dual independent Parker GVM310-125 205 kW motors | 2020 to present | |
Transmission | |||
Eaton EEV-7202 2-speed auto-shift EV transmission | |||
Suspension | |||
Independent front suspension and multi-link air-ride rear suspension | |||
Brakes | |||
Regenerative brakes; Four wheel disc brakes w/ ABS and optional traction control | |||
Battery options | |||
Model | Nominal range | Standard charge time | Curb weight |
ProDrive ZX5 | 200 km (35ft); 188 km (40ft) | 2.8 hours (OppCharge); 2.9 hours (Plug-In) | 12,046 kg (35ft); 12,179 kg (40ft) |
DuoPower ZX5 | 201 km (35ft); 193 km (40ft) | 2.8 hours (OppCharge); 2.9 hours (Plug-In) | 11,956 kg (35ft); 12,088 kg (40ft) |
ProDrive ZX5+ | 365 km (35ft); 348 km (40ft) | 2.8 hours (OppCharge); 3.4 hours (Plug-In) | 13,543 kg (35ft); 13,630 kg (40ft) |
DuoPower ZX5+ | 386 km (35ft); 373 km (40ft) | 2.8 hours (OppCharge); 3.4 hours (Plug-In) | 13,453 kg (35ft); 13,539 kg (40ft) |
ProDrive ZX5MAX | 478 km (40ft) | 2.9 hours (OppCharge); 4.7 hours (Plug-In) | 15,127 kg (40ft) |
DuoPower ZX5MAX | 529 km (40ft) | 2.9 hours (OppCharge); 4.7 hours (Plug-In) | 15,036 kg (40ft) |
Operators
Canada 
- Edmonton Transit Service (ETS) - Edmonton, AB
- Roam - Banff Region, AB
United States 
- Alexandria Transit Company (DASH) - Alexandria, VA
- Broward County Transit (BCT) - Broward County, FL
- Capital Transit System - Juneau, AK
- Charleston Area Regional Transit Authority - Charleston, SC
- Chicago Transit Authority - Chicago, IL
- Detroit Department of Transportation (DDOT) - Detroit, MI
- Eagle County Regional Transportation Authority - Eagle County, CO
- Everett Transit - Everett, WA
- GoRaleigh - Raleigh, NC
- Hillsborough Area Regional Transit - Tampa, FL (on order)
- Iowa City Transit - Iowa City, IA
- Madison Metro - Madison, WI
- Metro Transit - Minneapolis-St. Paul, MN (on order)
- MetroLINK - Rock Island, IL
- Regional Transportation Commission of Washoe County - Reno, NV
- Southern Teton Area Rapid Transit (START Bus) - Jackson, WY
- Suburban Mobility Authority for Regional Transportation (SMART) - (Suburban) Detroit, MI
- Texas A&M University (TAMU) - College Station, TX
- Tompkins Consolidated Area Transit (TCAT) - Ithaca, NY
- Miami-Dade Transit - Miami, FL (on order)
Demonstrator and engineering units
Below is a list of known demonstrator and engineering buses.
Fleet number | Thumbnail | Year | VIN | Motors | Notes |
---|---|---|---|---|---|
2019 | 7JZTH13J8KS000191 | Altoona test bus |
References
- ↑ Proterra Unveils the Proterra® ZX5 Next-Generation Battery-Electric Transit Vehicle. Retrieved September 15, 2020
- ↑ Greencarcongress.com
- ↑ ZX5 Electric Bus. Retrieved on September 15, 2020
- ↑ ZX5 Electric Bus. Retrieved on September 15, 2020